all k12 education projects
K12 Education
Canterbury School
Upper School, Music/Drama & Administrative Buildings
- location
- Fort Myers, FL
- size
- 44,248 sf
The Canterbury Upper School tilt-wall construction project consisted of the 2-story 37,173 sf high school classroom building, a 1-story 4,550 sf music/drama building and a 1-story 2,525 sf administration building. The classroom building included labs for physics, art, chemistry, biology and general science and a lecture hall. Wenger Audio Sound Booths were integrated into the music room. Practice athletic fields were added and the tennis courts were renovated and expanded. Extensive site-work included lake reconfiguration, major drainage changes and a nature area.
Share